PASSLEADER C_TSCM42_65 free dumps coaching product will certainly participate in a necessary position as part of your technique of getting ready your assessment. The idea not simply caters anyone every piece of information in connection with Assessment C_TSCM42_65 and also supplies anyone outstanding analyze product which are your SAP Request Affiliate qualifications assessment feasible for anyone. PASSLEADER will give you a wide examination option that may help you turn into SAP accredited specialized. C_TSCM42_65 prep guidebook incorporates no cost analyze guidebook, taste concerns along with replies, pdf file assessment, mental faculties deposits along with replies research that will provde the connection with true C_TSCM42_65 examination.

QUESTION 1
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option

Answer: B

QUESTION 2
What does SAP ERP mean?

A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

Answer: D

QUESTION 3
Which functions can be triggered before releasing a production order? (Choose three)

A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM

Answer: BCE

QUESTION 4
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes

Answer: BDE

QUESTION 5
Which of the following statements about consumption are correct? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

Answer: BD

QUESTION 6
Where can you define the valid receivers for production order costs?

A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant

Answer: C

http://www.passleader.com/c-tscm42-65.html

PASSLEADER train examination concerns are created by simply remarkably seasoned along with accredited training companies which may have build the top C_TSCM42_65 sample questions that could promise good results on the assessment. By simply getting PASSLEADER True exams assessment problem that may be often up-to-date, you will possess that is critical pertaining to filling out your assessment concerns.